Introduction

MGT Construction was proud to contribute to the development of Gatwick Airport’s all-electric vehicle charging station. By integrating innovative temporary works designs and precise formwork solutions, MGT delivered a high-quality result while meeting the unique challenges of this project.

Project Overview

Situated at the Gatwick South Terminal, this cutting-edge charging station required meticulous planning and execution. The project involved constructing a 4m high reinforced concrete blast wall to safeguard the adjacent hotel from battery storage operations. Additionally, MGT constructed various substations, transformer bases, and lift pits for vehicles and personnel. Despite the complexity, the project was completed in March 2023 with 300m³ of concrete placed across a 213m² surface area.

Challenges and Objectives

Safety Standards: Constructing a robust RC blast wall to meet stringent safety criteria.

Tight Space: Navigating limited working areas at a busy airport terminal.

Precision Requirements: Creating durable substations and lift pits tailored to operational needs.

Project Deadlines: Ensuring the project adhered to strict schedules.

MGT’s objective was to deliver a safe and efficient charging station while maintaining the highest standards of workmanship.

Scope of Work

MGT Construction undertook the following:

Blast Wall: Designed and built a 4m high RC blast wall using advanced formwork systems.

Substations: Installed critical infrastructure for power distribution.

Transformer Bases: Prepared and reinforced bases for heavy-duty transformers.

Lift Pits: Constructed pits to facilitate vehicle and personnel operations.

Results and Conclusion

The all-electric vehicle charging station at Gatwick South Terminal was successfully completed, meeting the client’s high expectations. The blast wall ensures robust protection, while the substations and transformer bases support efficient energy distribution. Despite the challenges, MGT delivered a safe, functional, and durable solution on time and within budget.

This project highlights MGT’s adaptability and technical expertise, showcasing their ability to manage complex, high-stakes infrastructure projects.