Introduction
MGT Construction’s innovative approach and proven track record in tackling complex projects made them the perfect partner for Ace Liftaway’s new recycling wash plant. This project, focused on sustainability and operational efficiency, highlights MGT’s ability to deliver tailored solutions that meet and exceed client expectations.
Project Overview
MGT Construction worked closely with Ace Liftaway to create a state-of-the-art recycling wash plant designed to optimize operations. Located in Romsey, Hampshire, this 2,967m² facility demanded precise execution to adhere to budget and tight deadlines. Designed by John Berry Associates, the project was successfully completed in December 2022, cementing MGT’s reputation for delivering excellence on demanding builds.
Challenges and Objectives
Extensive Trenching: Over 1,000 meters of trenching posed significant logistical and technical challenges.
Structural Complexity: The need for high-load slabs, retaining walls, and waterproof tanks required advanced engineering techniques.
Environmental Standards: Ensuring waterproof tanks met strict environmental and operational regulations.
Time Constraints: Delivering the project on time while maintaining uncompromising quality.
MGT aimed to provide a facility that was durable, environmentally compliant, and completed within the project’s ambitious time frame.
Scope of Work
MGT Construction undertook both substructure and superstructure tasks, ensuring every aspect of the project was executed with precision:
Substructure: The team conducted extensive trenching and site preparation to establish a robust foundation capable of supporting the plant’s operational demands.
Superstructure: MGT placed and finished 1,200m³ of reinforced concrete, forming essential elements such as slabs, plinths, staircases, and retaining walls. Advanced techniques were employed to construct waterproof tanks, ensuring durability and compliance with environmental regulations.
Results and Conclusion
MGT Construction successfully delivered the recycling wash plant on schedule and within budget. The facility’s robust design supports high-capacity recycling operations, seamlessly aligning with Ace Liftaway’s workflow. By employing innovative construction methods and prioritizing sustainability, MGT not only met but exceeded client expectations.